The main log section is on a dry laid stone foundation so was not suitable for plumbing.
So I had to plan an addition that would contain the water works for a kitchen and bathroom, with heat and AC.
This is a sketch I did that I ended up really liking.
While no longer needed I think it is still a very doable plan.
Well, maybe some day.